The version 5.12 is going to be released soon and so we need to plan the next release. It will be IJC version 6.0 and the release is currently planned around April/May. The attached spreadsheet describes the possible features that can be worked on during the 6.0 release cycle.
Except the feature which you prioritize we'd like to look also at these areas:
- general usability: we are getting feedback about complexity of IJC user interface. We'd like to simplify the most important usecases, make IJC more user friendly
- performance: other round of performance improvements were done in IJC 5.12 in browsing complex relational data. A few more improvements are planned for 6.0
We believe these two areas are important for all IJC users.
Could you plesase look at the attached spreadsheet and send me your priorities by January 13th? Please fill 150 points for priority 1 and 150 points for priority 2.
Thank you.
And Happy New Year to all!
Petr
ChemAxon e189db4705
07-01-2013 16:06:46
Hi all,
We have added more detailed descriptions to all tasks. Please see attached version 2 of the prioritization spreadsheet.
Please let us know if any feature is not clear or if any of your important feature is missing in the document. Of course we can explain any of these features in a call. If you prefer call or webex, please let me know time and we'll arrange the webex session.
Best regards,
Petr
ChemAxon e189db4705
23-01-2013 01:48:50
Hi all,
we got the priorities from all of you already (thank you!) and collected them together. There are still some unknowns as we got also several requests for new features which were not listed in the original spreadsheet. We need to work on a quick evaluation and then I'll post one spreadsheet with collected priorities and proposal for the 6.0 plan.
Dana Vanderwall has asked me whether we can do a GoToMeeting session all together and discuss the overlap in priorties among companies - the same like what we did for 5.12 in October.
Here are some time slots proposed: http://doodle.com/dtkfqfgb6zzwqfue It's filled for CET (17-19 and 16-19). Switch it to your timezone if doodle doesn't do it automatically for you. Please vote which time works for you.
Thank you,
Petr
ChemAxon e189db4705
30-01-2013 21:25:02
Hi all,
I'm sorry we need to postpone the call to next week as we still don't have finalised plans which we can discuss together. I'm going to send some time options tomorrow to this forum and will also contact you all via email.
Thank you,
Petr
ChemAxon e189db4705
31-01-2013 05:11:31
User 9aa4619393
01-02-2013 08:51:00
Hi Petr,
could you please let us have the spreadsheet with the aggregated proritizations prior to the meeting?
Thanks,
Anna
User 9aa4619393
06-02-2013 13:00:17
Hi Petr,
I was wondering whether we will have the phone discussion tomorrow?
FYI, I am off next week so I wouldn't be able to participate until the week after next.
Thanks
Anna
ChemAxon e189db4705
06-02-2013 22:20:50
Hi all,
yes, the call is tomorrow as was result of your voting.
The call is on Feb/7 17:30 CET, 16:30 UK, 11:30am US East
Here are the go-to-meeting details:
1. Please join my meeting, Thursday, February 07, 2013 at 17:30 CET
https://www3.gotomeeting.com/join/909120310
2. Use your microphone and speakers (VoIP) - a headset is recommended. Or, call in using your telephone.
Dial +1 (510) 443-0605
Access Code: 909-120-310
Audio PIN: Shown after joining the meeting
Meeting ID: 909-120-310
-------
I'm going to send the result of your priorities in the following post.
ChemAxon e189db4705
06-02-2013 23:48:30
Hi all,
The attached document contains aggregated priorities from you. We are going to explain it in detail tomorrow in the call, but just very quick comments now:
- The total sum of priorities is done the same way like last release: P1 (priority 1) has 2 points, P2 has 1 point, so the result in column K is sum of these values from all of your + ChemAxon. Maximum was 6 points for some features.
- The spreadsheet is mostly ordered by this value - again the same like in 5.12.
- The 6.0 release will give us about 8 weeks for implementation of new features (it has already started last week). Based on previous experience we can fit about 90-100, in optimistic variant maybe 110 points into it.
- It means we should finish all tasks with 4-6 points, but not all with 3 points. Choosing the right tasks is the important task for tomorrow.
- Some tasks are not explained enough as they came later during prioritization and were not in the original spreadsheet. We can give more details tomorrow too.
So please take the attached version as a working version, not final plan for 6.0. The goal for tomorrow is to finalize it.
Talk to you soon.
Petr
ChemAxon e189db4705
14-03-2013 14:18:12
Hi all,
we are close to so called "feature freeze" for 6.0. It means that only bugs are going to be fixed after that time and no new features can be added. We still have several features in progress and hope most of them can be finished by this deadline.
The attached spreadsheet contains current status of development of 6.0. As we discussed during the prioritization call we wanted to do mainly all features which got 4 or more points in sum (column K), and we are able to finish only some of those with 3 points. I'll keep you informed about what finally could go into the release. It should be clear in two weeks from now.
Feel free to send me any feedback.
Thank you,
Petr
ChemAxon e189db4705
02-12-2013 10:11:17
Final list of 6.0 features is in attached spreadsheet. For more info please go to the release notes.